Participating in the construction of the Zhambyl Submersible Drilling Rig was crucial as it was the first project of this kind in Kazakhstan. Project was ordered by DAEWOO Shipbuilding & Marine Engineering Co., LTD in 2011-2012 .  The rig weighs 6400 tonnes and is 100 m long. The drilling rig is designed to operate in shallow (2.5 – 5.5 m) water with a maximum well drilling depth of 6 000 m.

PROJECT DETAILS

312

MOBILISED

PERSONNEL

We provided the following positions for the project: Welders, Pipe Fitters, Riggers, Foremen, Supervisors and Welding Inspectors.

6

DIFFERENT

NATIONALITIES

We mobilised the following nationalities: Kazakh, Italians, Indians, Filipinos, Thais and Romanians.

2012

THE STARTING DATE

OF THE PROJECT

Project started in 2012 and was completed by the end of 2014 with the delivery of the barge to the final client according schedule.